Case Study : 360 Megawatt Facility
Case Studies

360 Megawatt Facility
Located near Reno, Nevada. Bates received and installed six 501AA Westinghouse gas turbine/generators, and performed all Civil, Mechanical, and Electrical work.

Foundations
Large, single pour, foundations with rebar and anchor bolts in place for 501AA units.

Turbines and Generators
Turbines and Generators were erected with gantry system as shown here.

Exhaust Duct System
Exhaust duct and stack housing SCR and CO catalyst systems.

Switch Yard
345KV high voltage switch yard. Bates fabricated the structural steel system in Bainbridge, Georgia and shipped to Reno.