Case Study : C-130J Two Bay Hangar
Case Studies

Box Truss Erection
A multiple crane lift of a 190' structural steel box truss.

Girder Truss Assembly
Erection of a heavy girder truss performed by dual cranes and steel erection team.

Masonry Fire Wall Construction
A 53' tall masonry fire wall was constructed between the fuel cell and general maintenance bays.

Interior Hangar Offices
Masonry and dry wall constructed mechanical rooms with compressed air and breathing air compressors.

Masonry Office Space
Interior employee breakrooms, offices and restrooms.

Ceiling Mounted Ventilation Hoses
Electrically operated air hoses and reels are used to ventilate aircraft and fuel cells during maintenance.

Electric Bridge Crane
Remote control bridge crane system was installed in the general maintenance bay.

Exterior Hangar Doors
A state of the art fabric hangar door system was installed in each hangar bay.

Concrete Apron Paving
Specialized aircraft paving was installed to access the hangar.

Hangar Office Entrance
Custom colored masonry trimmed with architectural precast concrete was utilized in the entrance construction.