Warning: mkdir(): Read-only file system in /var/www/easywp-plugin/wp-nc-easywp/vendor/wpbones/wpbones/src/Foundation/Log/LogServiceProvider.php on line 118

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
A-1 Industries of GA - Bates Engineering

Our Experience : Manufacturing & Food Processing

Safety Arrows

A-1 Industries of GA

  • Design/build Prime contractor for a 163,000 SF truss manufacturing facility with 14,000 SF of administrative space
  • Bates self-performed civil, environmental and structural design.
  • Bates self-performed over 36% of the construction effort, including all foundation systems, slab forming and reinforcing, conveyor equipment installation, admin office steel erection, structural steel fabrication, door installations, and miscellaneous finishes.

Bates was selected by this regional leader in truss manufacturing to design and build their first facility outside of Florida.  Bates design and construction team worked with the client to fully understand their needs for the new plant, including making trips to the existing operations in another state.  Site work included the land planning of a 60-acre site with grading an improved area of 20 acres for building pad, parking lots, load/unload drives and finished goods storage.  Manufacturing space was complete with fire protection, CAT6 data distribution equipment and network, air ventilation units with evaporative cooling, and a large compressed air piping network.  Two story admin space provided conference areas, training area, employee break and locker rooms as well as open and private offices.  Main building structure was PEMB with metal wall panels and SSRM roof.  Also included the design, construction and installation of over 400’ of under-slab conveying systems to remove wood waste. 

Image 15 of 16