Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
Vegetable Oil Refinery and Regional Office - Bates Engineering

Our Experience : Manufacturing & Food Processing

Safety Arrows

Vegetable Oil Refinery and Regional Office

  • Oil Refinery capable of meeting the entire domestic need for this type of vegetable oil
  • Rail and Truck loading facilities complete with automated scale
  • 5 Million Gallon product storage tank farm
  • 8000 SF Regional Office Building with decorative concrete tilt-walls.

Bates served as the design/build prime contractor for this industrial complex located in Georgia.  Project required the demolition of an old food processing facility to make way for the new facilities.  Sitework including new utility services, road systems, parking and the addition of 2000 LF of railroad spur.  Refinery was designed and built to house complex process equipment along with indoor loadout/scale facility.  Office was designed and built to support the regional activities of the client.