Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
Decatur County WTP - Bates Engineering

Our Experience : Water / Wastewater

Safety Arrows

Decatur County WTP

  • High Speed Pump Station Refurbishment
  • Complete Upgrade of a Water Treatment Facility originally built in 1942
  • Provided Bypass Pumping to allow the treatment facility to stay online during the 12 month project

Bates served as the General Contractor on this complete overhaul of an existing Water Treatment facility.  Over 75% of the contract was self-performed by Bates personnel.  Major features of the work included SCADA/VFD controlled 100% bypass pumping systems to maintain operations throughout the project, demolition and removal of existing cast iron piping systems along with high speed pumps, installation of all new plant underground piping and valves, new high speed pumps, new SCADA/telemetry, new emergency power systems, new chemical feed systems at two existing wells, and inspection of existing water storage tank.