Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
32 MVA Improvements - Bates Engineering

Our Experience : Military Facilities

Safety Arrows

32 MVA Improvements

  • Extensive mechanical, electrical and security upgrades to an existing Tier 3 Data Center
  • Mechanical:  Install new 400 Ton Chiller and major replacement of chilled water infrastructure at multiple existing chillers
  • Electrical:  Two new 3.2 MW Electric Generators along with new switchgear and electrical houses to support emergency power system.

The Bates team was selected as the Prime Contractor to provide this major upgrade to an existing federal Tier 3 data center located in the Southern US.  This project is unique due to the highly critical functions the data center serves in our nation’s digital infrastructure.  All data center operations had to be maintained during the upgrades and a high level of security surrounded the project.