Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
JCSE Squadron Facility - Bates Engineering

Our Experience : Military Facilities

Safety Arrows

JCSE Squadron Facility

  • 78,000 SF Squadron Operation Facility
  • Design/Build contract with Bates serving as Prime Contractor/Lead Designer
  • LEED Gold Certified by USGBC

USACE-Mobile District selected Bates Engineers/Contractors, Inc. to perform turnkey design/build services for this project located in Florida.  The facility consisted of team training spaces and common areas on the lower floors and administrative spaces and classrooms on the second floor.  The building had a highly intricate communications infrastructure and several access controlled rooms and vaults for secure transmissions.  This facility was the first to achieve a LEED Gold Certification from the USGBC on this Florida military installation.

Image 1 of 7