Warning: mkdir(): Read-only file system in /var/www/easywp-plugin/wp-nc-easywp/vendor/wpbones/wpbones/src/Foundation/Log/LogServiceProvider.php on line 118

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
SOF Simulator Facility - Bates Engineering

Our Experience : Military Facilities

Safety Arrows

SOF Simulator Facility

  • Multilevel 15,000 SF addition to existing facility
  • Facility has a 50’ clear height open bay with overhead crane for aircraft simulator
  • LEED Gold Certified by USGBC

Bates Engineers/Contractors, Inc. was selected as the Prime Contractor on this Simulator Facility located in Florida.  Unique project features include the use of helical and rammed aggregate piers during foundation installation, 250-car  pervious concrete parking lot, and special communications infrastructure to support the facility mission.  The building received LEED Gold Certification from USGBC—the first building to achieve this Certification on this Military Installation.

Image 5 of 7