Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
C-130J Two Bay Hangar - Bates Engineering

Our Experience : Military Facilities

Safety Arrows

C-130J Two Bay Hangar

  • New 60,000 SF Hangar to house two C-130J aircraft including administrative space and fuel cell testing
  • Contract included the renovation of an existing C-130 hangar and extensive airfield concrete paving

The Bates team was selected by USACE-Savannah District to provide Prime Contractor services for this project located in North Carolina.  The construct-only contract included the new 60,000SF hangar along with major renovations of an existing aircraft hangar.  The new hangar allow for the maintenance and testing of aircraft fuel cells and included fabric hangar doors, fall protection systems,  personnel air breathing system, AFFF fire protection and over 10,000 SF of administrative space.  Project also included several thousand yards of concrete airfield paving for aprons and aircraft parking.