Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
NCEMC - Bates Engineering

Our Experience : Power Generation

Safety Arrows

NCEMC

  • 360 MW Dual-Fueled Simple-Cycle Peaking Power Facility
  • 300 MW Dual-Fueled Simple-Cycle Peaking Power Facility
  • 60 MW Unit Addition to Previously Constructed Power Facility


The NCEMC projects were constructed as three separate projects at two locations in North Carolina.  Both plants are designed to operate on natural gas and liquid fuel.  Aero-derivative turbines serve as the main generation equipment.  Bates performed the role of General Construction Contractor responsible for all site construction efforts.