Our Experience : Power Generation

Safety Arrows

NCEMC

  • 360 MW Dual-Fueled Simple-Cycle Peaking Power Facility
  • 300 MW Dual-Fueled Simple-Cycle Peaking Power Facility
  • 60 MW Unit Addition to Previously Constructed Power Facility


The NCEMC projects were constructed as three separate projects at two locations in North Carolina.  Both plants are designed to operate on natural gas and liquid fuel.  Aero-derivative turbines serve as the main generation equipment.  Bates performed the role of General Construction Contractor responsible for all site construction efforts.