Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
Starwood Midway - Bates Engineering

Our Experience : Power Generation

Safety Arrows

Starwood Midway

  • 120 MW Simple Cycle Peaking Power Facility
  • SCR/CO Catalyst Exhaust Systems with 70’ Stacks
  • High Voltage Switchyard


The Starwood Midway project consisted of two each 60MW simple cycle units constructed on a greenfield site in California.  Project included installation of all BOP necessary to operate the plant including erection of three(3) 75,000 gallon water storage tanks, aqueous ammonia offloading and storage facility, natural gas service, step-up transformer and high voltage switchyard.  Bates served as the General Construction Contractor responsible for all site construction efforts and self-performed over 80% of the contract.