Our Experience : Power Generation

Safety Arrows

TriCenter Power Plant

  • 360 MW Simple Cycle Peaking Plant Consisting of 6 Each 60 MW Units
  • SCR/CO Catalyst Exhaust Systems with 90’ Stacks
  • High Voltage Switchyard


The TriCenter power project was constructed outside of Reno, Nevada.  The greenfield project consisted of 6 each 501AA Westinghouse turbine units that had been in previous service in Japan.  Project included the placement of over 4000 cubic yards of concrete along with the installation of all power plant equipment, BOP and a 345kV high voltage switch yard.  The plant achieved first fire within 8 months of groundbreaking which is a remarkable achievement by the entire project team.

Image 1 of 5