Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wptbox/wp-includes/functions.php on line 6114
Taurus USA Headquarters - Bates Engineering

Our Experience : Manufacturing & Food Processing

Safety Arrows

Taurus USA Headquarters

    • Design/build Prime contractor for a 205,000 SF U.S. headquarters to house an international leader in Firearms manufacturing.
    • Bates self-performed civil, environmental and structural design.
    • Bates self-performed over 40% of the project, including all concrete foundation systems, slab forming and reinforcing, tilt wall construction and erection, structural steel fabrication, door installations, and miscellaneous finishes.

    Bates was selected to build this US Headquarters for a firearms manufacturer locating to Georgia.  The facility consisted of 180,000 SF production area for machining, assembling, and testing guns.  This area included loading docks, assembly areas, shelving systems for parts and finished goods as well as two indoor firing ranges.  The facility also included a 25,000 SF administrative area for management, customer service and quality control.  The interior of the warehouse has polished concrete floors, painted walls and painted ceilings including the exposed steel, HVAC with special humidity controls, fire protection and electrical.  The interior of the administration area has an industrial look with polished floors, reclaimed woods, glass walls and sliding glass doors.  The exterior of the building consisted of a joist and girder steel frame with painted tilt-wall concrete panels, a membrane roof, decorative storefronts, wall paneling, sun shades and stone.  The site included 10+ acres of grading, 22,275 SY of asphalt paving for the parking lot and ½ mile road to the outdoor firing range.  Underground utilities included electrical, telecommunication, natural gas, storm sewer, sanitary sewer, fire protection and domestic water.  The entire property was landscaped and surrounded by security fencing.  A new guardhouse was constructed for controlled access to the facility and security measures were installed including electric access doors and video surveillance.